Archive

Posts Tagged ‘glazing’

Fridge in, landscaping started

October 26, 2013 Leave a comment

The fridge is in, no thanks to the contractor who made the space too small.

20131026-150037.jpg

It backs onto the heat pump water heater which scavenges fridge waste heat.

20131026-150145.jpg

The glass in the master shower is now properly supported, something the Lakeway City inspector didn’t like. I got the CRL hardware myself and Mike my handyman put it on, rather than getting the incompetents who left it like that back in.

20131026-150403.jpg

Landscaping is in full swing. The City rules say no more than a 2ft drop hence the terracing on the driveway. Culvert under the driveway is nicely hidden by the rock bridge.

20131026-150513.jpg

Lots of stone and dirt keeps arriving onto the driveway.

20131026-150620.jpg

20131026-150655.jpg

They cleared this area of rocks to use elsewhere in the landscape.

20131026-150752.jpg