Home > Plumbing > Odd jobs

Odd jobs

Yesterday I put the numbers on the house.

20140119-141157.jpg

I also finally put these door handles on. No one seemed to want to do this ! I don’t know why, it wasn’t that hard.

20140119-141259.jpg

I also refitted a door strike the painters took off and never replaced. And a coax and phone outlet that was not replaced.

I also fired up the heat pump hot water heater for the first time. At first I thought there was a problem as the trip switch was on but there was no power. But after getting a meter I was able to ascertain that the separate disconnect near the heater had power and then found the connector was not fully pushed home. Once pushed in hard it powered up.

By God it’s noisy! If I ‘d known it was that noisy I would have put it in the garage. Better yet, next door’s garage. It’s like having a truck engine in the pantry!

20140119-141821.jpg

By the way, note the Ethernet jack bottom right for the Internet of Water Heaters and other Things. This can enable smart grid variable pricing etc but with Pedernales Electric we should just be thankful for a supply, they’re not exactly pro- green.

Advertisements
  1. September 10, 2014 at 8:07 am

    Thanks for finally talking about >Odd jobs | Lakeway Usonian <Loved it!

  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: